Triple

T13070616
Position Surface form Disambiguated ID Type / Status
Subject Gronings Ontzet E329445 entity
Predicate instanceOf P0 FINISHED
Object local public holiday C15855 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: local public holiday
Context triple: [Gronings Ontzet, instanceOf, local public holiday]
  • A. local holiday chosen
    A local holiday is a day of celebration or observance recognized and typically granted time off only within a specific city, region, or locality rather than an entire country.
  • B. public holiday
    A public holiday is a legally designated day on which work and school are generally suspended to allow the population to observe cultural, historical, religious, or national events.
  • C. national holiday
    A national holiday is a legally recognized day of celebration or commemoration on which a nation collectively observes significant historical, cultural, or religious events, often with reduced work and school obligations.
  • D. package holiday provider
    A package holiday provider is a company that bundles and sells complete vacation packages, typically including transport, accommodation, and sometimes activities or meals, for a single combined price.
  • E. public holiday system
    A public holiday system manages, stores, and provides access to information about official holidays, including their dates, types, and applicable regions, to support scheduling, compliance, and planning activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80771749c81909a6d9197b9504872 completed April 9, 2026, 8:09 p.m.
Created at: April 9, 2026, 9 p.m.