Triple

T13036670
Position Surface form Disambiguated ID Type / Status
Subject Bharat Heavy Electricals Limited, Tiruchirappalli E326578 entity
Predicate instanceOf P0 FINISHED
Object BHEL unit C32376 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: BHEL unit
Context triple: [Bharat Heavy Electricals Limited, Tiruchirappalli, instanceOf, BHEL unit]
  • A. Jawahar Navodaya Vidyalaya
    Jawahar Navodaya Vidyalaya is a system of residential schools in India that provides quality education to talented rural children, primarily from grades VI to XII, with a focus on academic excellence, co-curricular development, and national integration.
  • B. Royal Indian Navy shore establishment
    A Royal Indian Navy shore establishment is a land-based naval facility used for administration, training, logistics, or support functions for the Royal Indian Navy, rather than for seagoing operations.
  • C. integrated steel mill
    An integrated steel mill is a large industrial complex that converts raw materials like iron ore, coal, and limestone into finished steel products through a continuous, vertically integrated process including coke making, ironmaking, steelmaking, and rolling.
  • D. Indian Air Force station
    An Indian Air Force station is a permanent military airbase facility operated by the Indian Air Force that supports aircraft operations, training, logistics, and administrative functions for air defense and related missions.
  • E. Indian naval air station
    An Indian naval air station is a shore-based military aviation facility of the Indian Navy that supports, operates, and maintains naval aircraft for maritime defense, surveillance, and related operations.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8076cc45c81908123123f43e69266 completed April 9, 2026, 8:09 p.m.
Created at: April 9, 2026, 8:55 p.m.