Triple

T13036466
Position Surface form Disambiguated ID Type / Status
Subject Kallanai E326573 entity
Predicate instanceOf P0 FINISHED
Object stone masonry dam C4159 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: stone masonry dam
Context triple: [Kallanai, instanceOf, stone masonry dam]
  • A. masonry gravity dam chosen
    A masonry gravity dam is a massive structure built from stone or brick masonry whose own weight resists the horizontal pressure of the water it retains.
  • B. concrete dam
    A concrete dam is a massive engineered barrier constructed primarily from concrete to hold back and control the flow of water in a river or reservoir.
  • C. concrete gravity dam
    A concrete gravity dam is a massive structure made of concrete that resists the horizontal thrust of water primarily through its own weight and the force of gravity.
  • D. embankment dam
    An embankment dam is a large artificial barrier constructed from compacted earth or rock materials to hold back water and create a reservoir.
  • E. arch-gravity dam
    An arch-gravity dam is a concrete dam that combines the curved, arch action of an arch dam with the mass and weight-based stability of a gravity dam to resist water pressure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8076cc45c81908123123f43e69266 completed April 9, 2026, 8:09 p.m.
Created at: April 9, 2026, 8:55 p.m.