Triple
T13019245
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | IFIP Technical Committee 2 |
E322632
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | IFIP technical committee |
C31988
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: IFIP technical committee Context triple: [IFIP Technical Committee 2, instanceOf, IFIP technical committee]
-
A.
organ of IFIP
chosen
An organ of IFIP is a formal structural body within the International Federation for Information Processing, such as a committee, working group, or council, that is established to carry out specific governance, coordination, or technical functions.
-
B.
committee of the Association for Computing Machinery
A committee of the Association for Computing Machinery is a formally organized group of ACM members tasked with overseeing and advancing specific activities, policies, or areas of interest within the computing community.
-
C.
ISO/IEC subcommittee
An ISO/IEC subcommittee is a specialized working group within the joint International Organization for Standardization and International Electrotechnical Commission structure that develops, maintains, and oversees standards in a specific technical or thematic area.
-
D.
telecommunications committee
A telecommunications committee is a group responsible for overseeing, planning, and guiding policies, standards, and initiatives related to communication networks and technologies within an organization or governing body.
-
E.
United States national committee of the IEC
The United States National Committee of the IEC is the U.S. body responsible for coordinating national participation in the International Electrotechnical Commission’s standardization activities and representing U.S. interests in global electrotechnical standards development.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d807657e8c8190bd9435ee2f823845 |
completed | April 9, 2026, 8:09 p.m. |
Created at: April 9, 2026, 8:51 p.m.