Triple
T13016586
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Watford Locks |
E322567
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | flight of canal locks |
C32331
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: flight of canal locks Context triple: [Watford Locks, instanceOf, flight of canal locks]
-
A.
canal lock
A canal lock is a gated chamber in a waterway that raises or lowers boats between stretches of water at different levels by controlling the water height within the enclosure.
-
B.
lock and dam structure
A lock and dam structure is an engineered system on a waterway that combines a gated dam to control water levels with a lock chamber to raise and lower vessels between different elevations for safe and efficient navigation.
-
C.
swing aqueduct
A swing aqueduct is a movable water bridge that pivots horizontally to allow both canal traffic across a gap and the passage of boats or vehicles beneath by swinging out of the way.
-
D.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
E.
movable bridge
A movable bridge is a type of bridge with a deck or section that can be mechanically raised, lowered, rotated, or otherwise repositioned to allow the passage of water or land traffic beneath or through it.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d807657e8c8190bd9435ee2f823845 |
completed | April 9, 2026, 8:09 p.m. |
Created at: April 9, 2026, 8:51 p.m.