Triple
T13014861
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hawker P.1040 |
E322523
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | prototype jet fighter aircraft |
C5549
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: prototype jet fighter aircraft Context triple: [Hawker P.1040, instanceOf, prototype jet fighter aircraft]
-
A.
jet-powered aircraft
chosen
A jet-powered aircraft is a fixed-wing or VTOL vehicle that generates thrust primarily from one or more jet engines to achieve and sustain flight.
-
B.
prototype bomber aircraft
A prototype bomber aircraft is an experimental military airplane built to test and refine new bombing technologies, designs, and capabilities before potential mass production and operational deployment.
-
C.
single‑engine fighter aircraft
A single-engine fighter aircraft is a fast, maneuverable military airplane powered by one engine and designed primarily for air-to-air combat and limited ground-attack missions.
-
D.
fighter aircraft
A fighter aircraft is a fast, highly maneuverable military airplane designed primarily to secure air superiority by engaging and destroying enemy aircraft in combat.
-
E.
jet-powered hydroplane
A jet-powered hydroplane is a high-speed watercraft that uses jet propulsion and a specialized hull design to skim across the water’s surface with minimal drag.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d807657e8c8190bd9435ee2f823845 |
completed | April 9, 2026, 8:09 p.m. |
Created at: April 9, 2026, 8:50 p.m.