Triple

T1301342
Position Surface form Disambiguated ID Type / Status
Subject John Wilkinson E27769 entity
Predicate instanceOf P0 FINISHED
Object ironmaster C6739 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ironmaster
Context triple: [John Wilkinson, instanceOf, ironmaster]
  • A. integrated steel mill
    An integrated steel mill is a large industrial complex that converts raw materials like iron ore, coal, and limestone into finished steel products through a continuous, vertically integrated process including coke making, ironmaking, steelmaking, and rolling.
  • B. steelmaking process
    The steelmaking process is an industrial sequence of operations that transforms iron ore and scrap into refined steel by removing impurities, adjusting chemical composition, and controlling temperature and structure to achieve desired material properties.
  • C. machinist
    A machinist is a skilled tradesperson who sets up, operates, and maintains machine tools to manufacture precision metal or plastic parts according to technical specifications.
  • D. Jaeger
    A Jaeger is a massive, human-piloted combat mech designed to battle colossal threats using advanced weaponry, heavy armor, and synchronized neural control.
  • E. steel finishing facility
    A steel finishing facility is an industrial plant where semi-finished steel products undergo surface treatment, coating, cutting, and other final processing steps to meet specific quality, dimensional, and performance requirements.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a496d6682881909ba658f1c1e0e2b0 completed March 1, 2026, 7:43 p.m.
Created at: March 1, 2026, 7:51 p.m.