Triple

T12986052
Position Surface form Disambiguated ID Type / Status
Subject Piazza Barberini E321768 entity
Predicate mainFountainCompletion P81661 FINISHED
Object 1643 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1643 | Statement: [Piazza Barberini, mainFountainCompletion, 1643]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: mainFountainCompletion
Context triple: [Piazza Barberini, mainFountainCompletion, 1643]
  • A. domeCompleted
    Indicates that the construction or formation of a dome structure has been fully finished.
  • B. mainLineCompleted
    Indicates that the primary or central process, route, or sequence of steps has been fully finished or brought to completion.
  • C. currentMainHallCompleted
    Indicates that the construction or setup of the current main hall has been fully completed.
  • D. majorPhaseCompletion
    Indicates that a significant or primary phase of a larger process, project, or lifecycle has been fully completed.
  • E. waterSupplySystemCompletedIn chosen
    Indicates that the construction or establishment of a water supply system was completed in a specified time or place.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8076479b8819090afce3591939cdf completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69d97f2a71a0819098bb6cf8a4b2208a completed April 10, 2026, 10:52 p.m.
PD Predicate disambiguation batch_69d97dbdd94c8190ac4bbecca02dc77b completed April 10, 2026, 10:46 p.m.
Created at: April 9, 2026, 8:40 p.m.