Triple

T12973594
Position Surface form Disambiguated ID Type / Status
Subject Royalton Hotel interior design E321464 entity
Predicate instanceOf P0 FINISHED
Object landmark interior design project C8137 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: landmark interior design project
Context triple: [Royalton Hotel interior design, instanceOf, landmark interior design project]
  • A. interior design project chosen
    An interior design project is a planned and coordinated process of transforming an interior space’s function, aesthetics, and atmosphere through the selection and arrangement of materials, furnishings, colors, lighting, and spatial layouts to meet specific client needs and style goals.
  • B. interior design firm
    An interior design firm is a professional business that plans, designs, and coordinates the aesthetic and functional layout of interior spaces for residential, commercial, or institutional clients.
  • C. architectural renovation project
    An architectural renovation project is a coordinated effort to redesign, upgrade, and adapt an existing building or space to meet new functional, aesthetic, regulatory, and sustainability requirements while preserving or enhancing its structural integrity and character.
  • D. sustainable design project
    A sustainable design project is an initiative that plans, develops, and implements solutions minimizing environmental impact while balancing social responsibility and economic viability throughout a product, service, or system’s life cycle.
  • E. architectural remodeling project
    An architectural remodeling project is a coordinated effort to redesign, upgrade, or reconfigure an existing structure’s spaces, systems, and aesthetics to better meet current functional, regulatory, and stylistic requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80763bd6c819094437da5b20b01d2 completed April 9, 2026, 8:09 p.m.
Created at: April 9, 2026, 8:36 p.m.