Triple
T12972901
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Canmore Nordic Centre |
E321447
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Nordic skiing centre |
C7017
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Nordic skiing centre Context triple: [Canmore Nordic Centre, instanceOf, Nordic skiing centre]
-
A.
skiing institute
A skiing institute is an organization dedicated to teaching, training, and advancing skills and knowledge in skiing for participants of varying ages and proficiency levels.
-
B.
ski area
chosen
A ski area is a designated mountain or hillside location equipped with ski lifts, groomed trails, and related facilities where people can ski, snowboard, and engage in other winter sports.
-
C.
ski jumping hill
A ski jumping hill is a specially designed, sloped structure with an inrun, takeoff, and landing area that allows ski jumpers to gain speed and safely perform long-distance jumps.
-
D.
bobsleigh, skeleton and luge track
A bobsleigh, skeleton and luge track is a specially engineered, ice-covered course with banked curves and straightaways designed for high-speed sliding sports using sleds.
-
E.
ski area sector
A ski area sector is a distinct, mapped portion of a ski resort comprising specific lifts, runs, and facilities that functions as a recognizable sub-area for navigation, management, and operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d80763bd6c819094437da5b20b01d2 |
completed | April 9, 2026, 8:09 p.m. |
Created at: April 9, 2026, 8:36 p.m.