Triple

T12953074
Position Surface form Disambiguated ID Type / Status
Subject High Rock Dam E309939 entity
Predicate isUpstreamOf P5955 FINISHED
Object Narrows Dam E314030 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Narrows Dam | Statement: [High Rock Dam, isUpstreamOf, Narrows Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Narrows Dam
Context triple: [High Rock Dam, isUpstreamOf, Narrows Dam]
  • A. Narrows Dam chosen
    Narrows Dam is a hydroelectric dam located on the Yadkin River in North Carolina, forming part of a major reservoir and power-generating system in the region.
  • B. Horseshoe Dam
    Horseshoe Dam is a concrete arch dam on Arizona’s Verde River that forms Horseshoe Lake and provides water storage, flood control, and recreation.
  • C. Howden Dam
    Howden Dam is a large masonry dam in Derbyshire, England, forming part of the Upper Derwent Valley reservoir system and known for its impressive architecture and role in regional water supply.
  • D. Alcova Dam
    Alcova Dam is a concrete arch-gravity dam in central Wyoming that creates Alcova Reservoir on the North Platte River for irrigation, hydropower, and recreation.
  • E. McClure Dam
    McClure Dam is a hydroelectric dam on the Dead River in Michigan, forming McClure Basin and providing power and water management for the surrounding region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdfb57a88190836b743e2825feca completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d97e1edcdc8190a702c2a5ea58cc67 completed April 10, 2026, 10:47 p.m.
NED1 Entity disambiguation (via context triple) batch_69fdf0683b90819098864f73b6976517 completed May 8, 2026, 2:17 p.m.
Created at: April 9, 2026, 5:44 p.m.