Triple

T12953043
Position Surface form Disambiguated ID Type / Status
Subject High Rock Dam E309939 entity
Predicate operator P179 FINISHED
Object Cube Hydro Carolinas E660375 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cube Hydro Carolinas | Statement: [High Rock Dam, operator, Cube Hydro Carolinas]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cube Hydro Carolinas
Context triple: [High Rock Dam, operator, Cube Hydro Carolinas]
  • A. Cube Hydro Carolinas chosen
    Cube Hydro Carolinas is a hydroelectric power company that owns and operates multiple renewable energy facilities in the Carolinas region of the United States.
  • B. Hydro
    Hydro is a music producer known for collaborating with the artist Nibiru.
  • C. Monster Hydro
    Monster Hydro is a non-carbonated, lightly sweetened energy drink line from Monster Beverage that combines hydration-style beverages with added caffeine and electrolytes.
  • D. Rumba Rapids
    Rumba Rapids is a family-friendly river rapids water ride at Thorpe Park in the UK, featuring swirling currents and themed scenery.
  • E. Balneario de Carolina
    Balneario de Carolina is a popular public beach in Carolina, Puerto Rico, known for its wide sandy shoreline, recreational facilities, and family-friendly atmosphere near San Juan.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdfb57a88190836b743e2825feca completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d97e1edcdc8190a702c2a5ea58cc67 completed April 10, 2026, 10:47 p.m.
NED1 Entity disambiguation (via context triple) batch_69f6b8dc135c819091b7708d90db25cb completed May 3, 2026, 2:54 a.m.
Created at: April 9, 2026, 5:44 p.m.