Triple
T12948012
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Huey P. Long Bridge (Baton Rouge) |
E309818
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Mississippi River bridge |
C22181
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Mississippi River bridge Context triple: [Huey P. Long Bridge (Baton Rouge), instanceOf, Mississippi River bridge]
-
A.
river bridge
chosen
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
B.
Hudson River bridge
A Hudson River bridge is a large transportation structure spanning the Hudson River to connect communities and facilitate the movement of vehicles, trains, pedestrians, or utilities between its banks.
-
C.
railroad bridge
A railroad bridge is a specialized structure that carries railway tracks over obstacles such as roads, rivers, valleys, or other rail lines, ensuring safe and continuous train passage.
-
D.
bridge in New York City
A bridge in New York City is a large-scale transportation structure spanning waterways or land to connect boroughs and neighborhoods, supporting vehicular, rail, bicycle, and pedestrian traffic within the city’s dense urban environment.
-
E.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdfb57a88190836b743e2825feca |
completed | April 9, 2026, 2:55 p.m. |
Created at: April 9, 2026, 5:43 p.m.