Triple

T12945390
Position Surface form Disambiguated ID Type / Status
Subject Buffalo Main Light Rail line on Main Street E309748 entity
Predicate instanceOf P0 FINISHED
Object surface-running transit corridor C2488 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: surface-running transit corridor
Context triple: [Buffalo Main Light Rail line on Main Street, instanceOf, surface-running transit corridor]
  • A. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • B. underground rail corridor
    An underground rail corridor is a subsurface passageway engineered to safely guide trains between stations, housing tracks, utilities, and supporting infrastructure while minimizing surface disruption.
  • C. rapid transit line segment chosen
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • D. suburban railway corridor
    A suburban railway corridor is a dedicated rail route connecting city centers with surrounding residential suburbs, designed to support frequent, high-capacity commuter train services.
  • E. transport corridor
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdfb57a88190836b743e2825feca completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:43 p.m.