Triple

T12940839
Position Surface form Disambiguated ID Type / Status
Subject Sydney to Hobart Yacht Race E309631 entity
Predicate usualStartDate P288 FINISHED
Object 26 December LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 26 December | Statement: [Sydney to Hobart Yacht Race, usualStartDate, 26 December]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: usualStartDate
Context triple: [Sydney to Hobart Yacht Race, usualStartDate, 26 December]
  • A. estimatedStartDate
    Indicates the date on which something is expected or planned to begin, based on current information or projections.
  • B. startDate chosen
    Indicates the point in time when an event, state, or relationship begins.
  • C. previewStartDate
    Indicates the date and time when a preview period for something begins.
  • D. startsAt
    Indicates that an event, process, or state begins at a specific time, location, or point in a sequence.
  • E. calculationStartDate
    Indicates the date on which a particular calculation or computation process begins.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdfa933c8190b5a27aa4a08a19b7 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d97e59a4c88190907d05b8d57dae89 completed April 10, 2026, 10:48 p.m.
PD Predicate disambiguation batch_69d97db69f548190a1a693bc0d6c191a completed April 10, 2026, 10:46 p.m.
Created at: April 9, 2026, 5:43 p.m.