Triple
T12924676
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lewiston Pump-Generating Plant |
E309212
|
entity |
| Predicate | balancesWith |
P107039
|
FINISHED |
| Object | Robert Moses Niagara Power Plant |
E63650
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Robert Moses Niagara Power Plant | Statement: [Lewiston Pump-Generating Plant, balancesWith, Robert Moses Niagara Power Plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Robert Moses Niagara Power Plant Context triple: [Lewiston Pump-Generating Plant, balancesWith, Robert Moses Niagara Power Plant]
-
A.
Robert Moses Niagara Power Plant
chosen
The Robert Moses Niagara Power Plant is a major hydroelectric generating station in New York that harnesses the flow of the Niagara River to produce electricity.
-
B.
St. Lawrence–FDR Power Project
The St. Lawrence–FDR Power Project is a major hydroelectric generating facility on the St. Lawrence River that supplies renewable power to New York State and neighboring regions.
-
C.
Monroe Power Plant
Monroe Power Plant is a large coal-fired power generating station located on the western shore of Lake Erie in Monroe County, Michigan.
-
D.
Sault Ste. Marie Canal Powerhouse
The Sault Ste. Marie Canal Powerhouse is a historic hydroelectric generating station that supplied power for the operation of the Sault Ste. Marie Canal in Ontario, Canada.
-
E.
Palisades Powerplant
Palisades Powerplant is a hydroelectric generating facility in Idaho that produces electricity using water released from Palisades Dam on the Snake River.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: balancesWith Context triple: [Lewiston Pump-Generating Plant, balancesWith, Robert Moses Niagara Power Plant]
-
A.
balancesInterest
Indicates that an entity manages or adjusts multiple interests or priorities so that none is disproportionately favored over the others.
-
B.
requiresBalanceWith
Indicates that one entity’s state, quantity, or action must be countered or matched by another to maintain an overall balance or equilibrium.
-
C.
historicalBalance
Indicates a relationship where an entity’s past or previous balance amount is recorded or referenced over time.
-
D.
aimsToBalance
Indicates an intention or effort by one entity to bring multiple elements, forces, or conditions into a state of equilibrium.
-
E.
forceBalance
Indicates that the net forces acting on an entity or system are in equilibrium, resulting in no overall acceleration.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdfa933c8190b5a27aa4a08a19b7 |
completed | April 9, 2026, 2:55 p.m. |
| NER | Named-entity recognition | batch_69d971e9576c81908eb59569af6da877 |
completed | April 10, 2026, 9:55 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f6c0eaa3688190b399aa212e16ca08 |
completed | May 3, 2026, 3:28 a.m. |
| PD | Predicate disambiguation | batch_69d96fab4d0881909a7a4d66bab9aa85 |
completed | April 10, 2026, 9:46 p.m. |
| PDg | Predicate description generation | batch_69d970f6f5748190ad35aff801db53d5 |
completed | April 10, 2026, 9:51 p.m. |
Created at: April 9, 2026, 5:42 p.m.