Triple

T12922199
Position Surface form Disambiguated ID Type / Status
Subject MTA New York City Transit Subdivision B E309151 entity
Predicate instanceOf P0 FINISHED
Object rapid transit operating division C1888 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rapid transit operating division
Context triple: [MTA New York City Transit Subdivision B, instanceOf, rapid transit operating division]
  • A. rapid transit division chosen
    A rapid transit division is an organizational unit within a transportation agency responsible for planning, operating, and maintaining high-frequency, high-capacity urban rail or bus rapid transit services.
  • B. rapid transit line group
    A rapid transit line group is a collection of closely related or jointly operated rapid transit lines that share infrastructure, service patterns, or branding within a transit network.
  • C. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • D. railroad operating division
    A railroad operating division is a geographically defined segment of a railway system managed as a unit for train operations, crew assignments, dispatching, and maintenance activities.
  • E. historical transit operating division
    A historical transit operating division is an organizational unit within a past or legacy public transportation system responsible for managing and coordinating transit services, personnel, and resources within a specific geographic area or operational domain.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf92b588190acdf2a2291ac4590 completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:42 p.m.