Triple
T12915927
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pioneer 6 |
E308982
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Pioneer program spacecraft |
C2658
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Pioneer program spacecraft Context triple: [Pioneer 6, instanceOf, Pioneer program spacecraft]
-
A.
NASA spacecraft program
A NASA spacecraft program is an organized initiative that designs, develops, launches, and operates one or more spacecraft to achieve specific scientific, exploratory, or technological objectives in space.
-
B.
spacecraft program
A spacecraft program is an organized, long-term initiative that plans, develops, launches, and operates one or more spacecraft to achieve specific scientific, commercial, or exploratory objectives.
-
C.
spacecraft
A spacecraft is a vehicle or device designed to travel beyond Earth's atmosphere for purposes such as exploration, communication, research, or transportation.
-
D.
space probe
chosen
A space probe is an unmanned spacecraft designed to travel beyond Earth's orbit to collect scientific data about other celestial bodies and the space environment.
-
E.
Mars orbiter payload
A Mars orbiter payload is the collection of scientific instruments, sensors, and supporting hardware carried by a spacecraft in Mars orbit to observe, measure, and transmit data about the planet’s atmosphere, surface, interior, and space environment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdf92b588190acdf2a2291ac4590 |
completed | April 9, 2026, 2:55 p.m. |
Created at: April 9, 2026, 5:41 p.m.