Triple

T1290379
Position Surface form Disambiguated ID Type / Status
Subject Positive Train Control E27532 entity
Predicate abbreviation P43 FINISHED
Object PTC E27532 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: PTC | Statement: [Positive Train Control, abbreviation, PTC]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: PTC
Context triple: [Positive Train Control, abbreviation, PTC]
  • A. PTC chosen
    PTC is an advanced safety system used on railroads to automatically prevent train collisions, overspeed derailments, and other dangerous movements.
  • B. PTP
    PTP is a network-based time synchronization protocol defined by the IEEE 1588 standard that enables highly precise clock alignment across distributed systems.
  • C. PCT
    PCT is an international patent law treaty that streamlines the process of seeking patent protection for inventions in multiple countries through a single application.
  • D. PCT
    The PCT is a long-distance hiking and equestrian trail that spans over 2,600 miles along the U.S. West Coast from Mexico to Canada through California, Oregon, and Washington.
  • E. PRTC
    PRTC is a public transit agency serving Northern Virginia with commuter and local bus services.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a496d4ec448190ad653b2590c46711 completed March 1, 2026, 7:43 p.m.
NER Named-entity recognition batch_69a4c0d6af908190ade9c481cc6f0ad8 completed March 1, 2026, 10:42 p.m.
NED1 Entity disambiguation (via context triple) batch_69acacbf0cf48190937f620900b08d3f completed March 7, 2026, 10:54 p.m.
Created at: March 1, 2026, 7:51 p.m.