Triple

T12901058
Position Surface form Disambiguated ID Type / Status
Subject I-76 corridor through Philadelphia E308611 entity
Predicate connectsTo P845 FINISHED
Object Interstate 676 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 676 | Statement: [I-76 corridor through Philadelphia, connectsTo, Interstate 676]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 676
Context triple: [I-76 corridor through Philadelphia, connectsTo, Interstate 676]
  • A. Interstate 678
    Interstate 678 is a major freeway in New York City that connects John F. Kennedy International Airport in Queens to the Bronx via the Van Wyck Expressway and the Whitestone Expressway.
  • B. Interstate 675
    Interstate 675 is a short auxiliary interstate highway in the Atlanta metropolitan area that connects Interstate 75 in Henry County to Interstate 285 in DeKalb County, serving as a bypass route southeast of downtown Atlanta.
  • C. Interstate 265
    Interstate 265 is a beltway highway that partially encircles the Louisville metropolitan area, providing a bypass route around the city in Kentucky and Indiana.
  • D. Interstate 610
    Interstate 610 is a beltway freeway encircling central Houston, Texas, serving as a major loop that connects multiple radial highways and facilitates regional traffic flow.
  • E. Interstate 185
    Interstate 185 is a spur route of Interstate 85 in western Georgia that connects the Columbus area to the main interstate network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Interstate 676
Target entity description: Interstate 676 is a short auxiliary Interstate highway running through Philadelphia and Camden that links I-76 with I-95 and provides access to downtown Philadelphia and the Benjamin Franklin Bridge.
  • A. Interstate 678
    Interstate 678 is a major freeway in New York City that connects John F. Kennedy International Airport in Queens to the Bronx via the Van Wyck Expressway and the Whitestone Expressway.
  • B. Interstate 675
    Interstate 675 is a short auxiliary interstate highway in the Atlanta metropolitan area that connects Interstate 75 in Henry County to Interstate 285 in DeKalb County, serving as a bypass route southeast of downtown Atlanta.
  • C. Interstate 265
    Interstate 265 is a beltway highway that partially encircles the Louisville metropolitan area, providing a bypass route around the city in Kentucky and Indiana.
  • D. Interstate 610
    Interstate 610 is a beltway freeway encircling central Houston, Texas, serving as a major loop that connects multiple radial highways and facilitates regional traffic flow.
  • E. Interstate 185
    Interstate 185 is a spur route of Interstate 85 in western Georgia that connects the Columbus area to the main interstate network.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf7c1f0819098102569a8d8cbf5 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d97180ee708190b60a3e58c42f764f completed April 10, 2026, 9:54 p.m.
Created at: April 9, 2026, 5:40 p.m.