Triple

T12899825
Position Surface form Disambiguated ID Type / Status
Subject natbib E308584 entity
Predicate instanceOf P0 FINISHED
Object LaTeX package C10727 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: LaTeX package
Context triple: [natbib, instanceOf, LaTeX package]
  • A. Emacs package
    An Emacs package is a modular collection of Emacs Lisp code that extends or customizes the functionality of the Emacs text editor.
  • B. document preparation system
    A document preparation system is a software tool or suite that enables users to create, edit, format, and manage text-based documents, often integrating layout, styling, and output features for printing or digital distribution.
  • C. software package chosen
    A software package is a bundled collection of programs, libraries, configuration files, and metadata distributed together to provide specific functionality that can be easily installed, updated, and managed.
  • D. typesetting manual
    A typesetting manual is a reference guide that explains the principles, rules, and techniques for arranging text and visual elements on a page to achieve clear, consistent, and aesthetically pleasing printed or digital documents.
  • E. software package repository
    A software package repository is a centralized storage and distribution system that hosts, organizes, and provides access to software packages and their metadata for installation, update, and dependency management.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf7c1f0819098102569a8d8cbf5 completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:40 p.m.