Triple
T12892666
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | International Cataloguing Principles |
E308406
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cataloguing code principle |
C1000
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cataloguing code principle Context triple: [International Cataloguing Principles, instanceOf, cataloguing code principle]
-
A.
open-source software development principle
An open-source software development principle is a guiding rule or value that promotes transparent, collaborative, and freely accessible creation, modification, and distribution of software and its source code.
-
B.
library cataloging standard
A library cataloging standard is a formal set of rules and guidelines that ensures consistent description, organization, and access to library materials across collections and systems.
-
C.
nomenclature code
A nomenclature code is a standardized set of rules and conventions used to systematically name and classify entities within a specific scientific or technical domain.
-
D.
principle
chosen
A principle is a fundamental rule or guiding truth that shapes decisions, behavior, or understanding within a particular domain.
-
E.
software engineering guideline
A software engineering guideline is a documented recommendation or best practice that directs how software should be designed, developed, tested, and maintained to ensure quality, consistency, and efficiency.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdf7c1f0819098102569a8d8cbf5 |
completed | April 9, 2026, 2:55 p.m. |
Created at: April 9, 2026, 5:40 p.m.