Triple

T12882961
Position Surface form Disambiguated ID Type / Status
Subject Rebuilding of St Mary’s Church, Paddington Green E308146 entity
Predicate instanceOf P0 FINISHED
Object 19th-century architectural project C32020 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 19th-century architectural project
Context triple: [Rebuilding of St Mary’s Church, Paddington Green, instanceOf, 19th-century architectural project]
  • A. 19th-century infrastructure
    19th-century infrastructure encompasses the transportation, communication, and utility systems—such as railways, canals, telegraph networks, roads, and early urban services—built during the 1800s that enabled industrialization and expanded economic and social connectivity.
  • B. 19th-century residence
    A 19th-century residence is a dwelling built or styled in the architectural traditions of the 1800s, typically featuring period-specific materials, ornamentation, and spatial layouts reflective of the social and technological context of that era.
  • C. 19th-century bridge
    A 19th-century bridge is a transportation structure built during the 1800s that typically reflects the era’s industrial advances in materials and engineering, such as iron, steel, and improved masonry techniques.
  • D. 19th-century work
    A 19th-century work is any creative, intellectual, or artistic production—such as a book, painting, musical composition, or scientific treatise—created or first published between 1801 and 1900.
  • E. 18th-century building
    An 18th-century building is a structure constructed between 1701 and 1800 that typically reflects the architectural styles, materials, and construction techniques of that period, such as Georgian, Baroque, or Neoclassical design.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf69bc48190af6c2621f28ca351 completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:39 p.m.