Triple

T12882960
Position Surface form Disambiguated ID Type / Status
Subject Rebuilding of St Mary’s Church, Paddington Green E308146 entity
Predicate instanceOf P0 FINISHED
Object church rebuilding project C32019 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: church rebuilding project
Context triple: [Rebuilding of St Mary’s Church, Paddington Green, instanceOf, church rebuilding project]
  • A. contemporary church building
    A contemporary church building is a modern place of Christian worship that integrates current architectural styles, materials, and technologies while accommodating liturgical functions and community activities.
  • B. stone church building
    A stone church building is a religious structure constructed primarily from stone, typically featuring architectural elements such as a nave, altar, and often a steeple or tower for worship and community gatherings.
  • C. Reformed church building
    A Reformed church building is a Christian worship structure designed and used by congregations within the Reformed (Calvinist) tradition, typically characterized by simple, unadorned architecture that emphasizes preaching and congregational gathering.
  • D. church building type
    A church building type is a category of architectural design specifically intended for Christian worship, characterized by particular spatial layouts, symbolic elements, and functional features that support liturgical practices and congregational gatherings.
  • E. former church
    A former church is a building that was originally constructed and used for religious worship but has since been deconsecrated or repurposed for secular or alternative functions.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf69bc48190af6c2621f28ca351 completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:39 p.m.