Triple
T12865829
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Twee Rivieren Gate |
E307716
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | park entrance gate |
C22800
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: park entrance gate Context triple: [Twee Rivieren Gate, instanceOf, park entrance gate]
-
A.
entrance gate
chosen
An entrance gate is a physical structure that marks and controls access to a property or area, often providing security, privacy, and a defined point of entry.
-
B.
park section
A park section is a distinct, designated area within a larger park that serves specific recreational, ecological, or functional purposes.
-
C.
theme park entrance
The theme park entrance is the primary access point where guests transition from the outside world into the park, typically featuring ticketing, security, and iconic visual elements that establish the park’s identity and atmosphere.
-
D.
entrance to a national park
The entrance to a national park is the designated access point where visitors transition from surrounding areas into the protected natural landscape, often marked by signage, gates, and visitor facilities.
-
E.
park icon
A park icon is a simplified graphical symbol, often depicting trees, benches, or open green space, used to represent parks or recreational areas on maps and interfaces.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdf69bc48190af6c2621f28ca351 |
completed | April 9, 2026, 2:55 p.m. |
Created at: April 9, 2026, 5:37 p.m.