Triple
T12849580
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | controlling access to Adolf Hitler |
E307275
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | power mechanism in Nazi leadership |
C3624
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: power mechanism in Nazi leadership Context triple: [controlling access to Adolf Hitler, instanceOf, power mechanism in Nazi leadership]
-
A.
Nazi economic authority
A Nazi economic authority is a state-controlled institution or official body within Nazi Germany responsible for directing, regulating, and coordinating economic activity in line with the regime’s ideological, militaristic, and autarkic goals.
-
B.
Nazi report
A Nazi report is an official document produced by Nazi authorities or affiliated organizations that records observations, decisions, policies, or activities in line with the regime’s ideological, political, or military objectives.
-
C.
Nazi official
A Nazi official is a person who held an administrative, political, or military position within the National Socialist (Nazi) regime in Germany, responsible for implementing and enforcing its totalitarian, racist, and genocidal policies.
-
D.
Wehrmacht high command
The Wehrmacht high command was the central military leadership of Nazi Germany responsible for planning, directing, and coordinating the operations of the German armed forces during the Second World War.
-
E.
component of the Third Reich
chosen
A component of the Third Reich is any organizational, institutional, territorial, or ideological element that contributed to the structure, operation, or objectives of Nazi Germany between 1933 and 1945.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdf5e7cc8190be357278bc5ba3bb |
completed | April 9, 2026, 2:55 p.m. |
Created at: April 9, 2026, 5:36 p.m.