Triple

T12849580
Position Surface form Disambiguated ID Type / Status
Subject controlling access to Adolf Hitler E307275 entity
Predicate instanceOf P0 FINISHED
Object power mechanism in Nazi leadership C3624 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: power mechanism in Nazi leadership
Context triple: [controlling access to Adolf Hitler, instanceOf, power mechanism in Nazi leadership]
  • A. Nazi economic authority
    A Nazi economic authority is a state-controlled institution or official body within Nazi Germany responsible for directing, regulating, and coordinating economic activity in line with the regime’s ideological, militaristic, and autarkic goals.
  • B. Nazi report
    A Nazi report is an official document produced by Nazi authorities or affiliated organizations that records observations, decisions, policies, or activities in line with the regime’s ideological, political, or military objectives.
  • C. Nazi official
    A Nazi official is a person who held an administrative, political, or military position within the National Socialist (Nazi) regime in Germany, responsible for implementing and enforcing its totalitarian, racist, and genocidal policies.
  • D. Wehrmacht high command
    The Wehrmacht high command was the central military leadership of Nazi Germany responsible for planning, directing, and coordinating the operations of the German armed forces during the Second World War.
  • E. component of the Third Reich chosen
    A component of the Third Reich is any organizational, institutional, territorial, or ideological element that contributed to the structure, operation, or objectives of Nazi Germany between 1933 and 1945.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf5e7cc8190be357278bc5ba3bb completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:36 p.m.