Triple
T12848651
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Grosse Ile Toll Bridge |
E307250
|
entity |
| Predicate | parallelTo |
P1868
|
FINISHED |
| Object | Wayne County Bridge |
E717610
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Wayne County Bridge | Statement: [Grosse Ile Toll Bridge, parallelTo, Wayne County Bridge]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Wayne County Bridge Context triple: [Grosse Ile Toll Bridge, parallelTo, Wayne County Bridge]
-
A.
Wayne County Bridge
chosen
Wayne County Bridge is a vehicular bridge in Michigan that connects Grosse Ile to the mainland across the Detroit River.
-
B.
Ben Sawyer Bridge
The Ben Sawyer Bridge is a swing-span bridge in South Carolina that connects Sullivan’s Island to the mainland over the Intracoastal Waterway.
-
C.
Dunn Memorial Bridge
The Dunn Memorial Bridge is a major highway bridge spanning the Hudson River and connecting Albany and Rensselaer in New York State.
-
D.
Don N. Holt Bridge
The Don N. Holt Bridge is a major steel cantilever bridge in South Carolina that carries Interstate 526 over the Cooper River near Charleston.
-
E.
Driscoll Bridge
Driscoll Bridge is a major highway bridge in New Jersey that carries the Garden State Parkway over the Raritan River, serving as a key transportation link in the region.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdf5e7cc8190be357278bc5ba3bb |
completed | April 9, 2026, 2:55 p.m. |
| NER | Named-entity recognition | batch_69d9701fe684819084582d1b4c809429 |
completed | April 10, 2026, 9:48 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff99742618819083bba63ce9f27895 |
completed | May 9, 2026, 8:30 p.m. |
Created at: April 9, 2026, 5:36 p.m.