Triple
T12841673
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Magha |
E307065
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Hindu lunar month |
C5362
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Hindu lunar month Context triple: [Magha, instanceOf, Hindu lunar month]
-
A.
Islamic month
An Islamic month is one of the twelve lunar-based divisions of the Islamic calendar, beginning with the sighting of the new moon and used to determine religious observances and events in Islam.
-
B.
religious month
chosen
A religious month is a designated period in a calendar that holds special spiritual, ritual, or commemorative significance within a particular faith tradition.
-
C.
lunisolar calendar
A lunisolar calendar is a dating system that combines lunar months with periodic adjustments to align with the solar year, ensuring that months track the moon’s phases while years remain synchronized with the seasons.
-
D.
time period in the Jewish calendar
A time period in the Jewish calendar is a defined span of time—such as a day, week, month, festival, or year—structured according to Jewish religious law and tradition for ritual, historical, and communal purposes.
-
E.
Gurpurab
Gurpurab is a Sikh religious festival that commemorates the birth or death anniversary of a Sikh Guru, marked by prayers, processions, and community service.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdf52b94819096d6f0ba4ab50a98 |
completed | April 9, 2026, 2:55 p.m. |
Created at: April 9, 2026, 5:35 p.m.