Triple

T12837200
Position Surface form Disambiguated ID Type / Status
Subject Rokycany E306948 entity
Predicate traversedBy P225 FINISHED
Object D5 motorway NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: D5 motorway | Statement: [Rokycany, traversedBy, D5 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: D5 motorway
Context triple: [Rokycany, traversedBy, D5 motorway]
  • A. D5 motorway chosen
    The D5 motorway is a major Czech highway connecting Prague with the German border near Rozvadov, forming part of the European route E50 and a key transport corridor through the Plzeň Region.
  • B. D2 motorway
    The D2 motorway is a major Slovak highway forming part of the European route network, connecting Bratislava with the Czech Republic and Hungary and serving as a key north–south transport corridor.
  • C. D10 motorway
    The D10 motorway is a major Czech highway that connects Prague with the northeastern regions of the country, including cities such as Mladá Boleslav and Liberec.
  • D. D3 motorway
    The D3 motorway is a major Czech highway forming part of the route between Prague and the Austrian border, improving north–south transport through the South Bohemian region.
  • E. D1 motorway
    The D1 motorway is a major Slovak highway forming part of the country’s primary east–west transport corridor, connecting key cities including Bratislava and Košice.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf52b94819096d6f0ba4ab50a98 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d96ff015f4819090070a01f3938acc completed April 10, 2026, 9:47 p.m.
Created at: April 9, 2026, 5:35 p.m.