Triple

T12807058
Position Surface form Disambiguated ID Type / Status
Subject Blowering Dam E306171 entity
Predicate partOf P40 FINISHED
Object Snowy Mountains Scheme E67510 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Snowy Mountains Scheme | Statement: [Blowering Dam, partOf, Snowy Mountains Scheme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Snowy Mountains Scheme
Context triple: [Blowering Dam, partOf, Snowy Mountains Scheme]
  • A. Snowy Hydro Scheme chosen
    The Snowy Hydro Scheme is a large-scale hydroelectricity and irrigation complex in Australia’s Snowy Mountains, renowned as one of the country’s most significant engineering projects.
  • B. Goldfields Water Supply Scheme
    The Goldfields Water Supply Scheme is a historic Australian engineering project that transports water over hundreds of kilometers from Perth to the arid Eastern Goldfields region of Western Australia.
  • C. Gezira Scheme
    The Gezira Scheme is one of the world’s largest irrigation projects, located between the Blue and White Nile in Sudan and primarily devoted to cotton and other agricultural production.
  • D. New South Wales reserve system
    The New South Wales reserve system is a network of protected areas across the Australian state of New South Wales established to conserve biodiversity, natural landscapes, and cultural heritage.
  • E. Snowy Mountains Hydro-electric Power Act 1949
    The Snowy Mountains Hydro-electric Power Act 1949 is an Australian federal law that established the legal framework for developing and operating the Snowy Mountains Hydro-electric Scheme, one of the country’s largest renewable energy and water management projects.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf46c448190b1faa55aaacb6317 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d96e808130819080f404b3a7462c2e completed April 10, 2026, 9:41 p.m.
NED1 Entity disambiguation (via context triple) batch_69f68ec6556081909375fada79ddcb8c completed May 2, 2026, 11:54 p.m.
Created at: April 9, 2026, 5:31 p.m.