Triple

T12803923
Position Surface form Disambiguated ID Type / Status
Subject US Route 74/76 bridges E306093 entity
Predicate instanceOf P0 FINISHED
Object bridge pair C12355 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge pair
Context triple: [US Route 74/76 bridges, instanceOf, bridge pair]
  • A. pair of bridges chosen
    A pair of bridges is a conceptual structure representing two interconnected or complementary pathways that together enable traversal or connection between separate points or domains.
  • B. bridge network
    A bridge network is a system of interconnected bridges and links that provides multiple paths for traffic or data to travel between nodes, enhancing reliability and load distribution.
  • C. bridge approach
    A bridge approach is the section of roadway that transitions between the ground and the main span of a bridge, providing a smooth and stable connection for vehicles and pedestrians.
  • D. bridge ensemble
    A bridge ensemble is a coordinated group of bridges, either physically connected or conceptually related, designed or analyzed as a collective system for structural, functional, or aesthetic purposes.
  • E. bridge complex
    A bridge complex is a molecular assembly that physically links two distinct cellular structures or regions, facilitating communication, transport, or mechanical coupling between them.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf366888190a8cccb982606889c completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:30 p.m.