Triple

T12801826
Position Surface form Disambiguated ID Type / Status
Subject N700S series E306036 entity
Predicate instanceOf P0 FINISHED
Object Japanese Shinkansen train series C31908 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Japanese Shinkansen train series
Context triple: [N700S series, instanceOf, Japanese Shinkansen train series]
  • A. JR東日本の列車系統
    JR東日本の列車系統は、東日本旅客鉄道(JR東日本)が運行する在来線・新幹線などの各路線上で設定された運転系統やサービス区分を指し、列車の運行区間・種別・系統番号などによって利用者にわかりやすく整理・案内するための概念である。
  • B. mini-shinkansen line
    A mini-shinkansen line is a converted narrow-gauge railway upgraded to standard gauge and high-speed standards, allowing Shinkansen trains to run directly onto conventional lines while maintaining through-service with the main high-speed network.
  • C. named train
    A named train is a specific passenger rail service distinguished by a unique name, branding, and often a consistent route and schedule.
  • D. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • E. rapid rail system
    A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf366888190a8cccb982606889c completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:30 p.m.