Triple

T12801786
Position Surface form Disambiguated ID Type / Status
Subject Chuo Shinkansen (maglev) planning and construction E306035 entity
Predicate plannedIntermediateTerminus P19285 FINISHED
Object Nagoya Station vicinity LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nagoya Station vicinity | Statement: [Chuo Shinkansen (maglev) planning and construction, plannedIntermediateTerminus, Nagoya Station vicinity]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedIntermediateTerminus
Context triple: [Chuo Shinkansen (maglev) planning and construction, plannedIntermediateTerminus, Nagoya Station vicinity]
  • A. isPlannedTerminusFor
    Indicates that a location or endpoint is designated to serve as the final stop or end point for a route, line, or service in planning or future operations.
  • B. intermediateTerminus chosen
    Indicates that something serves as a temporary or middle stopping point within a larger route, process, or sequence.
  • C. plannedTransit
    Indicates that a transit or trip has been scheduled or arranged to occur, but has not yet taken place.
  • D. hasIntermediateStation
    Indicates that a route, journey, or connection includes a station that lies between its starting point and its final destination.
  • E. plannedLocation
    Indicates the intended or scheduled location where an entity is expected to be or an event is planned to occur.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf366888190a8cccb982606889c completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d96e7d3f5c8190bf01bef5d263ca26 completed April 10, 2026, 9:41 p.m.
PD Predicate disambiguation batch_69d9640ed7448190b276e7fab649f7d2 completed April 10, 2026, 8:56 p.m.
Created at: April 9, 2026, 5:30 p.m.