Triple

T12801779
Position Surface form Disambiguated ID Type / Status
Subject Chuo Shinkansen (maglev) planning and construction E306035 entity
Predicate instanceOf P0 FINISHED
Object maglev railway project C23700 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: maglev railway project
Context triple: [Chuo Shinkansen (maglev) planning and construction, instanceOf, maglev railway project]
  • A. maglev railway line chosen
    A maglev railway line is a transportation route equipped with magnetic levitation and guidance systems that enable high-speed, low-friction train travel along a dedicated track.
  • B. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • C. straddle-beam monorail
    A straddle-beam monorail is a transit system in which rubber-tired vehicles ride astride a single elevated concrete or steel beam, using it for both support and guidance.
  • D. automated guideway transit line
    An automated guideway transit line is a fully automated, driverless rail or rubber-tired transit system operating on a dedicated guideway, typically used for short- to medium-distance urban or campus circulation.
  • E. light rail expansion project
    A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf366888190a8cccb982606889c completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:30 p.m.