Triple

T12796693
Position Surface form Disambiguated ID Type / Status
Subject Baker Street and Waterloo Railway E305908 entity
Predicate instanceOf P0 FINISHED
Object predecessor of the Bakerloo line C31538 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: predecessor of the Bakerloo line
Context triple: [Baker Street and Waterloo Railway, instanceOf, predecessor of the Bakerloo line]
  • A. London Underground precursor chosen
    A London Underground precursor is any early urban rail or transport system, proposal, or technological development that directly influenced or led to the creation of the London Underground.
  • B. London Underground depot
    A London Underground depot is a specialized facility where Underground trains are stored, maintained, cleaned, and prepared for daily service on the network.
  • C. former transit line
    A former transit line is a previously operational public transportation route, such as a bus, tram, or rail line, that has been permanently discontinued or replaced.
  • D. Blue Line station
    A Blue Line station is a designated stop or terminal along a transit system’s Blue Line where passengers can board, alight, and transfer between vehicles or services.
  • E. Skyline station
    A Skyline station is an elevated or ground-level transit facility where passengers board, alight, and transfer between Skyline rail services and other transportation modes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf366888190a8cccb982606889c completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:30 p.m.