Triple

T12791730
Position Surface form Disambiguated ID Type / Status
Subject Port of Miami River terminals E305782 entity
Predicate instanceOf P0 FINISHED
Object port facilities C12386 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: port facilities
Context triple: [Port of Miami River terminals, instanceOf, port facilities]
  • A. former port facility
    A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
  • B. port facility personnel
    Port facility personnel are individuals responsible for the operation, security, safety, and management of activities and infrastructure within a port facility.
  • C. port authority
    A port authority is an organization responsible for managing, regulating, and developing a seaport or group of ports, including their infrastructure, operations, and related maritime activities.
  • D. port crane
    A port crane is a large, fixed or mobile lifting machine used at harbors and container terminals to load, unload, and move cargo between ships and the shore.
  • E. port area chosen
    A port area is a designated coastal or riverside zone equipped with infrastructure and facilities for the berthing, loading, unloading, storage, and transfer of cargo and passengers between land and water transport.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf366888190a8cccb982606889c completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:30 p.m.