Triple

T12791252
Position Surface form Disambiguated ID Type / Status
Subject London and the South East logistics corridor E305766 entity
Predicate instanceOf P0 FINISHED
Object logistics corridor C2952 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: logistics corridor
Context triple: [London and the South East logistics corridor, instanceOf, logistics corridor]
  • A. transport corridor chosen
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • B. freight rail corridor
    A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
  • C. trade and transportation corridor initiative
    A trade and transportation corridor initiative is a coordinated program to develop and optimize key routes, infrastructure, and policies that facilitate efficient movement of goods and people across regions or borders.
  • D. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • E. cross-border transport link
    A cross-border transport link is an infrastructure connection—such as a road, railway, bridge, tunnel, or ferry route—that enables the movement of people and goods between two or more countries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf366888190a8cccb982606889c completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:30 p.m.