Triple

T12790039
Position Surface form Disambiguated ID Type / Status
Subject El Qanater El Khayriya E305734 entity
Predicate hasStructure P35 FINISHED
Object Nile barrages E104433 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nile barrages | Statement: [El Qanater El Khayriya, hasStructure, Nile barrages]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nile barrages
Context triple: [El Qanater El Khayriya, hasStructure, Nile barrages]
  • A. Assiut Barrage on the Nile chosen
    The Assiut Barrage on the Nile is a major irrigation and water-control structure in Upper Egypt that regulates river flow and supports agriculture around the city of Assiut.
  • B. Aswan High Dam
    The Aswan High Dam is a massive embankment dam on the Nile River in southern Egypt, built in the 1960s to control flooding, provide hydroelectric power, and improve irrigation, while also causing the creation of Lake Nasser and the displacement of communities and archaeological sites in Nubia.
  • C. Aswan Low Dam
    The Aswan Low Dam is an earlier masonry gravity dam on the Nile River in Egypt, built by the British at the start of the 20th century to control flooding and support irrigation before the construction of the Aswan High Dam.
  • D. Upper Atbara and Setit Dam Complex
    The Upper Atbara and Setit Dam Complex is a major hydropower and irrigation infrastructure project in eastern Sudan that harnesses the waters of the Atbara and Setit rivers to generate electricity, support agriculture, and regulate water flow.
  • E. Khashm el-Girba Dam
    Khashm el-Girba Dam is a major embankment dam in eastern Sudan that provides irrigation water, hydroelectric power, and flood control along the Atbara River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf366888190a8cccb982606889c completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d96e6a61f48190972e241e70bc392c completed April 10, 2026, 9:40 p.m.
NED1 Entity disambiguation (via context triple) batch_69f68ebeab2081908a6e38351613e3ed completed May 2, 2026, 11:54 p.m.
Created at: April 9, 2026, 5:30 p.m.