Triple

T12786798
Position Surface form Disambiguated ID Type / Status
Subject Fort Worth Water Gardens E305650 entity
Predicate instanceOf P0 FINISHED
Object modernist landscape architecture work C6817 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: modernist landscape architecture work
Context triple: [Fort Worth Water Gardens, instanceOf, modernist landscape architecture work]
  • A. modernist architecture work
    A modernist architecture work is a building or structure characterized by minimalist forms, functional design, and the use of modern materials and construction techniques, often rejecting historical ornamentation.
  • B. modernist architectural work chosen
    A modernist architectural work is a building or structure characterized by functional design, minimal ornamentation, and the expressive use of modern materials and technologies to embody the principles of simplicity, clarity, and rationality.
  • C. modernist landscape
    A modernist landscape is a stylized representation of natural or built environments that emphasizes abstraction, simplified forms, and experimental composition over realistic depiction.
  • D. landscape architecture treatise
    A landscape architecture treatise is a comprehensive, theoretically grounded written work that systematically explores principles, methods, and philosophies for designing and managing outdoor spaces and environments.
  • E. modernist architecture movement
    The modernist architecture movement is a 20th-century design approach that emphasizes functional forms, minimal ornamentation, and the honest expression of materials and structure in response to industrialization and new technologies.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf2b43c819098ae5aa68e61ea58 completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:29 p.m.