Triple
T12770494
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 9 September |
E305235
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | date |
C31865
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: date Context triple: [9 September, instanceOf, date]
-
A.
day of the week
A day of the week is one of the seven recurring, named 24-hour periods that together structure the weekly cycle of time.
-
B.
month
A month is a unit of time, roughly based on the lunar cycle, that divides a year into twelve named periods of varying lengths.
-
C.
time period
A time period is a continuous span of time defined by specific start and end points, often characterized by particular events, conditions, or properties.
-
D.
calendar system
A calendar system is a structured method for organizing and measuring time into units such as days, weeks, months, and years to schedule, record, and coordinate events.
-
E.
calendar algorithm
A calendar algorithm is a computational method or set of rules used to calculate and manage dates, recurring events, and time-based patterns within a calendar system.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdf2b43c819098ae5aa68e61ea58 |
completed | April 9, 2026, 2:55 p.m. |
Created at: April 9, 2026, 5:28 p.m.