Triple

T12762157
Position Surface form Disambiguated ID Type / Status
Subject YO! Bus E305021 entity
Predicate instanceOf P0 FINISHED
Object intercity bus service brand C16196 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: intercity bus service brand
Context triple: [YO! Bus, instanceOf, intercity bus service brand]
  • A. intercity coach service
    An intercity coach service is a scheduled, long-distance bus transportation system that carries passengers between cities or towns, typically offering reserved seating, luggage capacity, and limited intermediate stops.
  • B. regional bus service
    A regional bus service is a public transportation system that operates scheduled bus routes connecting multiple towns or cities within a specific geographic area.
  • C. transport brand chosen
    A transport brand is a conceptual class representing a company or entity that provides transportation services or products, characterized by attributes like name, logo, service types, and reputation, and behaviors such as marketing, service delivery, and customer support.
  • D. high-speed rail service brand
    A high-speed rail service brand is a distinct identity and marketing concept that represents a specific provider’s fast, long-distance passenger train services, encompassing its name, visual design, service standards, and customer experience.
  • E. regional rail service brand
    A regional rail service brand is a distinct identity used to market and organize passenger train services within a specific geographic area, encompassing naming, visual design, and service characteristics.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf1fcd081909ffb0e0d6fa3a07d completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:28 p.m.