Triple
T12762037
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Prevost coaches |
E305018
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | tour bus |
C31853
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: tour bus Context triple: [Prevost coaches, instanceOf, tour bus]
-
A.
tourist excursion
A tourist excursion is a planned short-term trip or outing designed to provide travelers with leisure, sightseeing, cultural experiences, or recreational activities at one or more destinations.
-
B.
touring company
A touring company is an organization that plans, manages, and presents performances or events in multiple locations, often traveling with a cast, crew, and equipment to different venues.
-
C.
tour operator
A tour operator is a business or individual that designs, organizes, and sells packaged travel experiences, coordinating transportation, accommodation, activities, and other services for travelers.
-
D.
regional bus service
A regional bus service is a public transportation system that operates scheduled bus routes connecting multiple towns or cities within a specific geographic area.
-
E.
local bus route
A local bus route is a designated path within a limited geographic area along which buses operate on a regular schedule to transport passengers between specific stops.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdf1fcd081909ffb0e0d6fa3a07d |
completed | April 9, 2026, 2:55 p.m. |
Created at: April 9, 2026, 5:28 p.m.