Triple
T12740659
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sejm gardens |
E304480
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | landscaped green area |
C1203
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: landscaped green area Context triple: [Sejm gardens, instanceOf, landscaped green area]
-
A.
garden space
A garden space is a designated outdoor area intentionally arranged with plants, structures, and pathways to support relaxation, recreation, and aesthetic enjoyment.
-
B.
landscape garden
chosen
A landscape garden is a designed outdoor space that artfully arranges landforms, plants, water, and built features to create a harmonious, scenic, and often naturalistic environment for aesthetic enjoyment and recreation.
-
C.
ornamental grounds
Ornamental grounds are carefully designed and maintained outdoor areas featuring decorative plants, landscaping elements, and aesthetic structures intended to enhance the visual appeal of a property.
-
D.
public garden feature
A public garden feature is a designed element within a shared outdoor space—such as fountains, sculptures, pathways, or plant displays—intended to enhance aesthetic appeal, usability, and community enjoyment.
-
E.
greenbelt
A greenbelt is a designated area of open, undeveloped, and often protected land surrounding or within urban regions, intended to limit urban sprawl, preserve natural habitats, and provide recreational space.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdf1426c8190a4402e1c4cdec33a |
completed | April 9, 2026, 2:55 p.m. |
Created at: April 9, 2026, 5:26 p.m.