Triple

T12738602
Position Surface form Disambiguated ID Type / Status
Subject Mobile Launcher 2 E304429 entity
Predicate instanceOf P0 FINISHED
Object Saturn V mobile launcher C31820 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Saturn V mobile launcher
Context triple: [Mobile Launcher 2, instanceOf, Saturn V mobile launcher]
  • A. Apollo Lunar Module
    The Apollo Lunar Module was a two-stage, crewed spacecraft designed exclusively for lunar orbit operations and surface landings during NASA's Apollo missions.
  • B. space launch support vehicle
    A space launch support vehicle is a specialized ground or aerial platform that transports, positions, services, and supports rockets or spacecraft before and during launch operations.
  • C. expendable launch vehicle
    An expendable launch vehicle is a rocket designed for a single use to deliver payloads such as satellites or spacecraft into space, after which its components are discarded rather than recovered or reused.
  • D. Long Duration Propulsive EELV Secondary Payload Adapter mission
    A Long Duration Propulsive EELV Secondary Payload Adapter mission is a spaceflight that uses a propulsive ESPA ring on an Evolved Expendable Launch Vehicle to carry and operate secondary payloads for extended periods in space, providing independent maneuvering and mission flexibility separate from the primary payload.
  • E. orbital launch vehicle
    An orbital launch vehicle is a rocket-powered system designed to transport payloads from Earth's surface into orbit by achieving sufficient velocity and altitude to remain in continuous free-fall around the planet.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf1426c8190a4402e1c4cdec33a completed April 9, 2026, 2:55 p.m.
Created at: April 9, 2026, 5:26 p.m.