Triple

T12728070
Position Surface form Disambiguated ID Type / Status
Subject H-3 Freeway E304156 entity
Predicate hasBridgeOrTunnel P26674 FINISHED
Object Tetsuo Harano Tunnels E855519 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tetsuo Harano Tunnels | Statement: [H-3 Freeway, hasBridgeOrTunnel, Tetsuo Harano Tunnels]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tetsuo Harano Tunnels
Context triple: [H-3 Freeway, hasBridgeOrTunnel, Tetsuo Harano Tunnels]
  • A. Tetsuo Harano Tunnels chosen
    The Tetsuo Harano Tunnels are major highway tunnels in Hawaii that carry traffic through the Koʻolau Range on the island of Oʻahu.
  • B. Usui Pass tunnel system
    The Usui Pass tunnel system is a series of long railway tunnels in Japan that carry high-speed Shinkansen trains through the mountainous Usui Pass region.
  • C. Tateyama Tunnel
    Tateyama Tunnel is a high-altitude mountain tunnel in Japan that forms part of the scenic Tateyama Kurobe Alpine Route through the Northern Japan Alps.
  • D. Japanese Tunnels
    Japanese Tunnels are a network of underground passages in Bukittinggi, Indonesia, built by the Japanese during World War II and now serving as a historical tourist attraction.
  • E. Roki Tunnel
    Roki Tunnel is a strategic road tunnel through the Caucasus Mountains that serves as a key transport link between Russia and the breakaway region of South Ossetia in Georgia.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf1426c8190a4402e1c4cdec33a completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d964172490819080cd022ff8290b6e completed April 10, 2026, 8:56 p.m.
NED1 Entity disambiguation (via context triple) batch_69f67c884bd08190bf0022e8303a4987 completed May 2, 2026, 10:36 p.m.
Created at: April 9, 2026, 5:25 p.m.