Triple
T12722763
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ASTM C94 |
E304025
|
entity |
| Predicate | relatedTo |
P37
|
FINISHED |
| Object | ASTM C33 |
E300136
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ASTM C33 | Statement: [ASTM C94, relatedTo, ASTM C33]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: ASTM C33 Context triple: [ASTM C94, relatedTo, ASTM C33]
-
A.
ASTM C33
chosen
ASTM C33 is a standard specification that defines the quality and grading requirements for fine and coarse aggregates used in concrete construction.
-
B.
ASTM C150
ASTM C150 is a widely used ASTM standard that specifies the requirements for portland cement used in concrete and other construction applications.
-
C.
ASTM C94
ASTM C94 is a standard specification that governs the requirements and performance of ready-mixed concrete used in construction.
-
D.
ASTM C131
ASTM C131 is a standard test method that specifies procedures for determining the resistance of small-size coarse aggregate to degradation by abrasion and impact in a Los Angeles machine.
-
E.
ASTM C618
ASTM C618 is a standard specification that defines the requirements for coal fly ash and raw or calcined natural pozzolans used as supplementary cementitious materials in concrete.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdf084148190ab9d513dc0735af4 |
completed | April 9, 2026, 2:55 p.m. |
| NER | Named-entity recognition | batch_69d964148f988190a4d0e7b41614fa64 |
completed | April 10, 2026, 8:56 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f684e61e7081908dec7958e8bc1125 |
completed | May 2, 2026, 11:12 p.m. |
Created at: April 9, 2026, 5:24 p.m.