Triple

T12721375
Position Surface form Disambiguated ID Type / Status
Subject Burrinjuck Dam E303992 entity
Predicate partOfScheme P52847 FINISHED
Object Murrumbidgee Irrigation Scheme E318299 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Murrumbidgee Irrigation Scheme | Statement: [Burrinjuck Dam, partOfScheme, Murrumbidgee Irrigation Scheme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Murrumbidgee Irrigation Scheme
Context triple: [Burrinjuck Dam, partOfScheme, Murrumbidgee Irrigation Scheme]
  • A. Murrumbidgee Irrigation Area chosen
    The Murrumbidgee Irrigation Area is a major agricultural region in New South Wales, Australia, renowned for its extensive irrigation schemes that support fruit, rice, and other crop production.
  • B. Goldfields Water Supply Scheme
    The Goldfields Water Supply Scheme is a historic Australian engineering project that transports water over hundreds of kilometers from Perth to the arid Eastern Goldfields region of Western Australia.
  • C. Goulburn–Murray Irrigation District
    Goulburn–Murray Irrigation District is a major agricultural irrigation region in northern Victoria, Australia, supplying water to extensive dairy, horticulture, and mixed farming enterprises.
  • D. Ord River irrigation scheme
    The Ord River irrigation scheme is a major agricultural development in northern Western Australia that harnesses the Ord River’s water through dams and channels to support large-scale irrigated farming around Kununurra.
  • E. Murray–Darling Basin water management system
    The Murray–Darling Basin water management system is an integrated network of rivers, dams, and regulatory infrastructure designed to allocate, store, and manage water resources across southeastern Australia’s largest river basin for agriculture, communities, and the environment.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: partOfScheme
Context triple: [Burrinjuck Dam, partOfScheme, Murrumbidgee Irrigation Scheme]
  • A. statutoryScheme
    Indicates that one entity is part of, governed by, or defined within a particular statutory or legislative framework.
  • B. consideredPartOf chosen
    Indicates that one entity is regarded or treated as a component, segment, or subset of another entity within a larger whole.
  • C. partOfType
    Indicates that one entity represents a component, segment, or subset that belongs to or is included within the type or category represented by another entity.
  • D. partitionScheme
    Indicates how a whole is divided into distinct parts or segments according to a specific organizing scheme.
  • E. relatedGrantScheme
    Indicates that there is an associated grant scheme that is relevant or linked to the subject entity.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdf084148190ab9d513dc0735af4 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d96d89ea70819098c470344f172167 completed April 10, 2026, 9:37 p.m.
NED1 Entity disambiguation (via context triple) batch_69f684e61e7081908dec7958e8bc1125 completed May 2, 2026, 11:12 p.m.
PD Predicate disambiguation batch_69d96403957c81909acdee7bdae71696 completed April 10, 2026, 8:56 p.m.
Created at: April 9, 2026, 5:24 p.m.