Triple
T12706096
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Chilterns footpaths |
E303590
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | network of footpaths |
C15867
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: network of footpaths Context triple: [Chilterns footpaths, instanceOf, network of footpaths]
-
A.
long-distance footpath
A long-distance footpath is an extended, often waymarked walking route designed for multi-day journeys across varied landscapes, typically connecting towns, natural landmarks, or regions.
-
B.
pedestrian network
A pedestrian network is an interconnected system of walkways, sidewalks, crossings, and paths designed to facilitate safe and efficient movement of people on foot within and between areas.
-
C.
pedestrian walkway
A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
-
D.
walking path
A walking path is a designated route or track intended for pedestrian use, providing a safe and accessible way for people to walk, exercise, or enjoy their surroundings.
-
E.
trail system
chosen
A trail system is an interconnected network of designated paths and routes designed to guide users through natural or built environments for recreation, transportation, or exploration.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdef90d48190b46b88270e780946 |
completed | April 9, 2026, 2:55 p.m. |
Created at: April 9, 2026, 5:23 p.m.