Triple
T12703086
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kordon waterfront promenade |
E303510
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | seaside walkway |
C19040
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: seaside walkway Context triple: [Kordon waterfront promenade, instanceOf, seaside walkway]
-
A.
pedestrian walkway
A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
-
B.
seaside facility
A seaside facility is a coastal establishment that provides services, amenities, or infrastructure for recreation, tourism, or marine-related activities along the shoreline.
-
C.
seawall
A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
-
D.
waterfront street
chosen
A waterfront street is a public roadway or pedestrian thoroughfare that runs directly alongside a body of water, often featuring views, access points, and amenities oriented toward the shoreline.
-
E.
boardwalk
A boardwalk is a raised, typically wooden walkway built along beaches, wetlands, or scenic areas to provide pedestrian access and views while protecting the underlying environment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdef90d48190b46b88270e780946 |
completed | April 9, 2026, 2:55 p.m. |
Created at: April 9, 2026, 5:23 p.m.