Triple

T12684096
Position Surface form Disambiguated ID Type / Status
Subject Summit County, Colorado E303020 entity
Predicate contains P35 FINISHED
Object Eisenhower Tunnel E112507 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Eisenhower Tunnel | Statement: [Summit County, Colorado, contains, Eisenhower Tunnel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Eisenhower Tunnel
Context triple: [Summit County, Colorado, contains, Eisenhower Tunnel]
  • A. Eisenhower–Johnson Memorial Tunnel chosen
    The Eisenhower–Johnson Memorial Tunnel is a high-altitude vehicular tunnel through the Rocky Mountains in Colorado, carrying Interstate 70 beneath the Continental Divide.
  • B. Patterson Pass Tunnel
    Patterson Pass Tunnel is a key water conveyance tunnel in California that carries supplies for the State Water Project’s South Bay Aqueduct through the Diablo Range.
  • C. O'Neill Tunnel
    The O'Neill Tunnel is a major highway tunnel in downtown Boston that carries Interstate 93 beneath the city as part of the Big Dig project.
  • D. Homer Tunnel
    Homer Tunnel is a road tunnel in New Zealand’s Fiordland that provides critical access through the mountains on the route to Milford Sound.
  • E. Robertson Tunnel
    Robertson Tunnel is a major light rail tunnel in Portland, Oregon, carrying MAX trains through the West Hills between downtown and the city’s western suburbs.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d7bdee64a08190801c6d470aefd723 completed April 9, 2026, 2:55 p.m.
NER Named-entity recognition batch_69d961d68358819095bdaab8adf1dcf0 completed April 10, 2026, 8:47 p.m.
NED1 Entity disambiguation (via context triple) batch_69f671a733a48190b55d296573c86eaf completed May 2, 2026, 9:50 p.m.
Created at: April 9, 2026, 5:21 p.m.